Efficient refurbishment of shower and toilet facilities on Ameland

Efficient renovation of shower and toilet rooms on Ameland

For Holiday Farm De Nachtegaal on Ameland we delivered a complete renovation of the washroom areas within the accommodation. The existing facilities were obsolete and no longer met the required appearance and quality. The brief was to create a modern, warm and sustainable washroom environment that fits the atmosphere of a holiday farm.

Thanks to its unique island location, tight planning played a crucial role in addition to quality and appearance. Thanks to good preparation and efficient implementation, the entire project has been successfully completed within just three days.

Modern washroom interior with warm appearance

A natural and welcoming look was central to this project. All washroom cabins are finished in the decor Lion Wood, which ensures a warm wood-effect finish that is well suited to a recreational environment.

By choosing customisation and consistent material application, a calm, stylish interior was created that is both practical and visually appealing to guests.

Material choice tailored to recreational use and appearance

The washroom renovation uses high-quality Compact HPL panels, also known as solid-core HPL. This material is ideal for washroom areas within recreational environments, where intensive use and moisture play a major role.

The main characteristics of these materials:

  • Fully moisture resistant
  • Scratch- and impact-resistant
  • Easy to maintain
  • Long service life
  • High-quality appearance

This makes the new washroom facilities not only attractive, but also durable and resistant to daily use by guests.

Efficient layout for women’s and men’s rooms

Both the ladies and men’s sides of the washroom areas have been completely renewed. The project includes:

Ladies
2 shower cubicles
2 toilet cubicles

Men’s Side
2 shower cubicles
2 toilet cubicles

This layout creates a clear and functional space in which comfort and privacy are paramount.

Careful installation in unique island location

Working on Ameland requires a different approach than projects on the mainland. Transport, material supply and planning must be coordinated precisely to prevent delays.

To achieve maximum efficiency, the installation team stayed on site during the project and the team stayed overnight on the island. This allowed work to be carried out without interruptions and the overall lead time was limited to just three days.

This approach ensured that disruption at the site remained minimal and the project could be handed over quickly.

From removal to final handover

LockerSpecialist managed the entire process, from dismantling the existing situation to installation and delivery of the new washroom facility. All work was completed by our own installers, ensuring quality and finish throughout the project.

The result is a modern and sustainable washroom environment that fully meets the client’s requirements and the appearance of the facility.

Key features of this project

  • Complete washroom renovation within 3 days
  • Women’s and men’s washroom facilities completely renewed
  • Shower cubicles and toilet cubicles
  • Finished in a warm wood-effect decor (Lion Wood)
  • High quality HPL / Solid-core HPL materials
  • Moisture-resistant and suitable for intensive use
  • Precise planning and efficient implementation at island location
  • Supplied and installed in full by LockerSpecialist

The products for the category Toilet partitions are rated by our customers at 10.0 out of 10.0 based on 9 reviews.

Team LockerSpecialist

Our specialists are ready to help

Contact our specialists

Discover our brochure

  • Extensive range of lockers and washroom partitions
  • Custom-made solutions direct from our factory
  • Advice, delivery and installation from one specialist
Download our brochure
Discover our brochure